Case Studies in TRIZ: FBC(Fluidized Bed Combustion) Boiler's tube erosion
Editor | On 22, Jul 2002
Case Studies In TRIZ :
FBC(Fluidized Bed Combustion) Boiler’s tube erosion
Jeong-Gil LEE / Project Leader in Utility Plant(LG Chem)
* Seung-Bae LEE / Innovation Support Team(LG Chem)
Jeong-mook OH / TRIZ Consultant in LG-PRC(ojmook@lge.com)
Department of Innovation Support , LG Chemical Ltd. Yeosu plant
70-1, Hwachi-Dong, Yeosu-City, Chunranam-Do, Korea
E-mail: sbleej@lgchem.co.kr
TEL : 82-61-680-1075 FAX : 82-61-680-6005
Abstract
Our Utility Plant at Yeosu Plant have a FBC(Fluidized Bed Combustion)Boiler.
The FBC Boiler, when used in a particular process application, encounters the problem of tube erosion with coal.
By Improving tube erosion and changing its related material, we perfectly solved the problem of FBC Boiler’s tube erosion and achieved the maximum amount of operation days.
Introduction
In 1999, our LG Chem. Yeosu Plant adapted Six Sigma for quality improvement in products, service, and processes which ultimately improved customer satisfaction.
At that time, we also introduced the TRIZ activities (The Theory of Inventive Problem Solving) in order to solve our company’s technological problems.
So far, these innovation activities have consistently been used in our many business fields.
In 2001, we presented our practice in Italy (The 5th IMC User Group Meeting :『 Design a New Foam Separator ã€) to demonstrate how we used TRIZ/Tech Optimizer methodology to solve our problem.
Summary of Application of TRIZ
Initial Situation
In the FBC Boiler system, coal is fed into the furnace via the Loop Seal .
Then the coal is combusted and flows into the Hot Cyclone.
Afterwards, this coal called , imperfect combusted coal , is recycled again.
However, erosion is experienced by two factors ;
-
fluidized coal attack upon the surface of the tubes(due to the air feeding)
-
fluidized coal fell down along the surface of tubes
So , we often experience unexpected shut-downs.
<Fig.1 Tube erosion point in FBC Boiler>
Function Modeling
We have done the function modeling to define our real problem by considering various interactions between the tube, coal, and primary air. <Fig. 2>
<Fig.2 Function Modeling>
Problem Definition
We feed the primary air to fluidize into the boiler , but that caused the erosion.
This was the main problem we had to solve according to the project.
Technical Contradiction
The technical contradiction here is ;
If the air speed is increased , this will increase the combustion rate.
However, the erosion of the tube also increases.
When using the contradiction matrix, the following parameters were used ;
<Fig.3 Contradiction Matrix>
The inventive principle can be transformed from contradiction matrix is :
Mechanical Principle replacement : electricity or magnetic field
Intermediary : To induce the medium between tube and fluidized material
Preliminary action : To create preliminary conditions that will prevent the object from harmful factors.
Operation Zone / Time Analysis
Physical Contraction
The physical contraction in this system is ;
<Air speed>has to be fast, because <to increase the combustion rate>
<Air speed>has to be slow, because <to prevent tube erosion>
Separation Rule for space : increase the velocity of the air in Furnace(UZ/T1)
but decrease the velocity of the air (HZ/T2).
Substance-Field Analysis
The Su-F model of the problem ;
The first recommendation by the standard solution set is solved by the introduction of additives(S3) in the existing substance(S1).
And the second recommendation is solved by introducing the foreign third substance or modified substance (S4) between them.
And the third recommendation is solved by introducing a field(F1) which neutralizes the harmful effect.
Concept Generation
We generated several solutions by using TRIZ tool ;
Case 1. It’s proposed to install the protective housing to prevent tube from erosion. <Sub-problem> It’s anticipated secondary problems because of material of housing and installation method. |
|
Case 2. |
|
Case 3. |
|
Case 4. |
|
Case 5. Application |
Implementation
We investigated and attempted many cases to apply this concept,
-
Choose and Test the coating material which was resistant to erosion
:Coating material , range , height -
Method (How to spray the coating material onto the tube)
-
Other property
As we referred above, we perfectly solved the problem of FBC Boiler’s tube erosion and saved our failure cost.
Past | Present | |
Shutdown(period) | 157hr/yr | no experience |
Failure Cost | $ 0.36million – |
Conclusion
Since 1999, we solved many problems and gained valuable experience by using TRIZ and Six Sigma activity.
Especially, The creation of a new culture(TRIZ) is indeed very beneficial.
The information collected from the different problem solving tools is later on analyzed and used for other utility plants.
A series of technical concepts resulted from the various results that were produced by the TRIZ application.
As we discussed above, by developing surface processing and its related material, we perfectly solved the problem of FBC Boiler’s tube erosion and developed the maximum amount of the operation days.